Construction of a 480 metre long bridge for the new light rail line U81, over the Nordsternkreuz, over the A44 and the B8 at Duesseldorf Airport, the bridge sections are moved on 5 piers using the incremental launching method after assembly, North Rhine-Westphalia, Germany, Europe

px px dpi = cm x cm = MB
Details

Creative#:

TOP30039569

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

no

Property Release:

no

Right to Privacy:

No

Same folder images:

Same folder images