Work on the construction of the new Pfaffendorf Bridge, which spans the Rhine in Koblenz, is in full swing (aerial view with a drone) . The 180 million euro project envisages that the new bridge will initially be built parallel to the existing bridge. Once the old bridge has been completed and demolished, it is to be moved to its position, with the Electoral Palace on the left of the picture, and work on the new Pfaffendorf Bridge is in full swing L

px px dpi = cm x cm = MB
Details

Creative#:

TOP29548872

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

Not Available

Property Release:

Not Available

Right to Privacy:

No

Same folder images:

Same folder images