600 men are digging a tunnel under busy North London streets for the new two-mile tube which will link the present tube terminus at Highgate with the London and North Eastern Railway at Finchley Station. It is estimated that the work will take 15 months and that the new tube will be finished near the end of 1938. There is to be only one station at Highgate. Workmen driving the tunnel through the earth 130 ft below. A truckload of earth being pushed away from the furthermost point of the boring 130 ft below Highgate. 20 July 1937
px | px | dpi | = | cm | x | cm | = | MB |
Details
Creative#:
TOP18978433
Source:
達志影像
Authorization Type:
RM
Release Information:
須由TPG 完整授權
Model Release:
No
Property Release:
No
Right to Privacy:
No
Same folder images: