Lineman working with a wire rope hoist on a 380-kV long-distance line owned by the 50Hertz transmission system operator, track cables are being pulled from one pylon to the next with a helicopter, these cables will be used later to install the actual electric track cables, linemen sitting on the power poles are taking on the cables, Gudow, Schleswig-Holstein, Germany, Europe

px px dpi = cm x cm = MB
Details

Creative#:

TOP13077826

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

No

Property Release:

No

Right to Privacy:

No

Same folder images:

Same folder images